NATIONAL GRID FULLY RESTORED AFTER MULTIPLE TRIPPINGS
Normal operation has been restored on the National grid following multiple trippings on the 330kV transmission network
The Nigerian Independent system Operator NISO in a statement says the trippings affected a section of the national grid which disrupted power supply
NISO says it has implemented corrective measures in collaboration with the Transmission Company of Nigeria TCN and stabilises the power system.
The system Operator confirms that restoration efforts have been successfully completed, and the national grid has returned to normal operation.

More Stories
BELLS UNIVERSITY HOSTS ENGINEERING LEADERS AS OLUMAYOWA IDOWU LEADS AI-FOCUSED INDUCTION CEREMONY …To spotlight innovation, digital transformation and the future of engineering
Reliable energy, fundamental to industrialisation, employment generation – NSE
NORTHERN SENATORS FORUM CONDEMNS BINARI ATTACK,IN TARABA